No. Date Investment task Type of documentation Function Works performed for:
1 May 2011 Executive project of reconstruction of railway traffic control devices at the station Zgierz due to changes in circuits of the Pu defghG block and B electric linear valve (using EON-3) Executive project Inspector

Zakład Usług Technicznych [Institution of Technical Services]

„KOLTECH”

2 June 2011 Design and execution of construction works at the railway line Cracow – Medyka (state border) at the section Podłęże – Bochnia in the range of 16.000 – 39. 000 km realized within the project : „Modernization of the railway line E30/C-E30, secti0on Cracow – Rzeszów, stage III”. Executive project Cooperation

Thales Polska Sp. z o.o.

3 June 2011 Executive project of reconstruction of railway traffic control devices at level crossing of A cat. at 130.686 km of Baby-Piotrków Trybunalski route of the railway line No. 1 due to the widening of the road. Executive project Inspector

Zakład Usług Technicznych

„KOLTECH”

4 July 2011 Executive project of improvement accessibility to the railway line through a reconstruction of certain elements of infrastructure at the sections of the railway line No. 106 Rzeszów – Jasło realized within the Regional Operational Programme for Podkarpackie Voivodship for the years 2007 – 2013. Executive project Cooperation

Kombud S.A.

5 September 2011 Executive project of reconstruction of railway traffic control devices at the station Sosnowiec Maczki due to the renovation of the track No. 1 in the range of 12.637 – 13. 606 km and of the junctions No. 1 and 2. Executive project Designer

„DOLKOM” Sp. z o.o.

No. Date Investment task Type of documentation Function Works performed for:
6 October 2011 Executive project of reconstruction of railway traffic control devices at the stations Sosnowiec Maczki and Sosnowiec Kazimierz due to the renovation of the track No. 1 of the line 163 in the range of 2.035 – 4. 624 km and of the junction No. 19 at the station Sosnowiec Kazimierz. Executive project Designer

„DOLKOM” Sp. z o.o.

7 December 2011 Executive project of construction of a self-active vehicular signaling of SPA-2 type at level crossing of B cat. on 153.813 km of the line No. 12 and at that of C cat. On 45. 452 km of the line No. 13 at the Institution of Railways in Siedlce area. Executive project Designer

PKP Polskie Linie Kolejowe S.A. [Polish Railways]

Institution of Railways in Siedlce

8 May 2012 Executive project of modernization of the railway line Warsaw – Łódź, stage II. LOT C – other works. Design and execution of a collision-free junction on the national road No. 72 Rawa Mazowiecka – Łódź with the tracks of the railway line No. 1 Central Warsaw – Katowice in the town of Rogów. Executive project Inspector

Railway and Engineering Works Enterprise S.A.

Design and Construction Company

„TORPROJEKT” Sp. z o.o.

9 May 2012 Executive project of reconstruction of railway traffic control devices at the station Małkinia due to the revitalization of the railway line No. 34 Ostrołęka – Małkinia. Executive project Designer

PBIiK Sp. z o.o.

10 May 2012 Executive project of reconstruction of vehicular signaling devices due to an investment named: „Task No. 1 Expansion of the national road No. 9 of GP class from the intersection of Peasants’Batallions Ave. with Warsaw Uprising St. At thesection of 197+066.50 – 198+800.00 together with the necessary technical infrastructure, installations and construction equipment in Rzeszów. Executive project Designer

PBIiK Sp. z o.o.

11 May 2012 Executive project of reconstruction of railway traffic control devices in order to enable a service of the sidetrack of EC (Łódź Dąbrowa Przemysłowa) at the station Łódź Widzew on the track No. 2 during resurfacing the track No. 1 of the railway line No. 504 Łódź Chojny – Łódź Widzew. Executive project Designer

PORR (Polska ) S.A.

12 June 2012 Executive project of reconstruction of vehicular signaling devices on a level crotting at 95.979 km of the line No. 8 due to the change of the category from A into B realized within the project concerning a modernization of the railway line No. 8 at the section Radom – Skarżysko Kamiena, stage II. Executive project Designer

PBIiK Sp. z o.o.

13 July 2012 Executive project of reconstruction of railway traffic control devices in order to enable a service of the sidetrack of EC (Łódź Dąbrowa Przemysłowa) at the station Łódź Widzew on the track No. 1 following a construction of the ordinary junction No. 62 of the railway line No. 504 Łódź Chojny – Łódź Widzew. Executive project Designer

PORR (Polska ) S.A.

14 August 2012 Constuction project of building of a container transformer station 15/0.4 kV with an internal power line of the railway junction electric heating device at the station Łódź Dąbrowa for the project named: „Construction consisting in reconstruction of the track No. 1 on the railway line No. 450 Łódź Chojny – Łódź Widzew at the section from 0.875 to 6.818 km.” Constuction project Designer

PKP Energetyka S.A. Department in Warsaw-Distribution of Electricity ul. Sławińska 7/9, 01-218 Warszawa

Distribution District in Łódź ul. Tuwima 28,

90-002 Łódź

15 October 2012 Executive project of reconstruction of railway traffic control devices at the station Nowa Sól due to a resurfacing of the railway line No. 273 Wrocław Główny – Szczecin Główny at the track No. 1 at the section Nowa Sól – Niedoradz in the range of 139.776 – 139. 073 km. Executive project Designer

RDK Projekt sp. j.

16 October 2012 Executive project of reconstruction of railway traffic control devices at the station Niedoradz due to a resurfacing of the railway line No. 273 Wrocław Główny – Szczecin Główny at the track No. 1 at the section Nowa Sól – Niedoradz in the range of 139.776 – 139. 073 km. Executive project Designer

RDK Projekt sp. j.

17 November 2012 Executive project of reconstruction of railway traffic control devices, electricity and telecommunication engineering realized within the project named: „Reconstruction of the toll devices at the 35.071 km of the railway line No. 25 Łódź Kaliska – Dębica with a service transfer from the post of declaring the end of the train to the next dispositional station Mikołajów, in order to adapt it to remote service, elimination of the post of declaring the end of the train.” Executive project Designer

PBIiK Sp. z o.o.

18 December 2012 Executive project to improve the quality of transport services by ameliorating technical condition of the railway line No. 18 Kutno – Piła at the section Toruń – Bydgoszcz. Executive project Designer

PORR (Polska ) S.A.

19 December 2012 Executive project of construction of a self-active vehicular signaling at level crossing on 16..838 km and on 44.627 km of the railway line No. 15 Bednary – Łódź Kaliska and at that of C cat. On 45. 452 km of the line No. 13 due to the change of the category from B into C. Executive project Designer

PBIiK Sp. z o.o.

20 December 2012 Executive project of railway traffic control industry for a costruction project „Design and reconstruction of railway infrastructure destroyed by a railway accident on 8 November 2010 at the station Białystok.” Executive project Designer

PBIiK Sp. z o.o.

Design and Construction Company

„TORPROJEKT” Sp. z o.o.

21 December 2012 Executive project of railway traffic control industry for a costruction project „Design and reconstruction of railway infrastructure destroyed by a railway accident on 8 November 2010 at the station Białystok.” Executive project Designer

PBIiK Sp. z o.o.

Design and Construction Company

„TORPROJEKT” Sp. z o.o.

22 April 2013 Executive project Executive project Designer

Dalkia Łódź S.A.

23 October 2013 Improvement of the safety through a construction of new railway junctions with higher constructive standard – POliŚ 7.1 -71. Executive project Designer

OHL ZS POLSKA Sp. z o.o.

24 December 2013 Reconstruction of railway traffic control devices at the station Żelisławice, realized within the project named: „Revitalization of the railway line No. 61 and 572 at the section Włoszczowa North – Częstochowa Stradom”. Executive project Designer

KZA Kraków S.A.

25 December 2013 Reconstruction of railway traffic control devices at the station Koniecpol, realized within the project named: „Revitalization of the railway line No. 61 and 572 at the section Włoszczowa North – Częstochowa Stradom”. Executive project Designer

KZA Kraków S.A.

26 April 2014 Preparation of project and executive documentation implementing the exchange of non-occupation station tracks devices at the station Świeże Górne. Executive project Designer

PKP Polskie Linie Kolejowe S.A.

Institution of Railways in Skarżysko Kamienna

27 May 2014 Preparation of project and executive documentation implementing the exchange of profiling signaling to light signaling at the station Starachowice Wschodnie. Executive project Designer

PKP Polskie Linie Kolejowe S.A.

Institution of Railways in Skarżysko Kamienna

28 May 2014 Preparation of project and executive documentation implementing the exchange of of non-occupation station tracks and junction devices at the branch post Zalesie Gorzyckie. Executive project Designer

PKP Polskie Linie Kolejowe S.A.

Institution of Railways in Skarżysko Kamienna

29 September 2014 Execution of design and construction work on the route Strzałki – Idzikowice due to a creation of a branch post „Pilica” realized within the project named: „Modernization of the railway line No. 4 Central Bus Station.” Executive project Inspector

Kombud S.A.

30 October 2014 Construction of automatic line blockade at sections Miechów – Słomniki and Niedźwiedź – Zastów and installation of computer equipment to control devices of E type in place of a cube desktop in the building of the station Kozłów realized within the project titled „Revitalization of the railway line No. 8 at the section – Kozłów – Main Cracow. Executive project Designer

KZA Kraków S.A.

31 March 2015 Design and execution of works within the project „Improvement of safety and elimination of exploitation risks at level crossings – stage II” POliŚ 7.1 – 80. In terms of the Partial Order No. 2 ie. Design and execution of construction works for the task: „Improvement of safety and elimination of exploitation risks at selected level crossings in Mazowieckie, Podlaskie and Lubelskie voivodship.” Executive project Inspector

Kombud S.A.

No. Date Investment task Scope of works/strong>
1 From 01/09/2013 to 31/12/2014 Modernization of the railway line No.132 Completing for catenary network equipment (pegs, hangers, anchoring) at the railway line no.132, section Paczyna – Opole Groszowice, track 1 and 2
2 08/10/2013 Modernization of the catenary network on the railway line E65, section: Warsaw – Gdynia, stage I, area: LCS Malbork Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, rail courses and intertracks’ connections, location painting on the railway line E65, area: LCS Malbork
3 31/10/2013 Modernization of the railway line No.132 Completing for catenary network equipment (pegs, hangers, anchoring); route Tarnów Opolski – Opole Groszowice, track 1, sections: 83, 83a, 85, 87, 89, 91, 93, 95, 97. Route Błotnica Strzelecka – Strzelce Opolskie, track 1, sections: 7, 9, 11, 13, 15, 17. Route Paczyna – Toszek, track 2, sections: 2, 4, 6, 8, 10
4 08/11/2013 Modernization of the catenary network and electric heating of point switches devices at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance and electric connections of turnouts
5 05/11/2013 Modernization of the catenary network on the railway line no.131, section: Kalety – Strzebiń Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance
No. Date Investment task Scope of works/strong>
6 26/11/2013 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Implementation of unloading of piling fundaments on the order on Workshops on Generative Technologies on 04/11/2013 – 26/11/2013; implementation of unloading of catenary piles at the station Radziwiłłów Mazowiecki on 23/11/2013 – 25/11/2013
7 30_12_2013 Modernization of the railway line No.64 Psary – Kozłów Implementation of elctrocution protection and that from currents strazing on the trackside elements of railway traffic control ) located in the zone of influence of the catenary network of the railway line no.64, section Kozłów – Starzyny
8 30_12_2013 Revitalization of the railway line no.61 and 572 on the section Wloszczowa North – Częstochowa Stradom Execution of the telecommunication works for the station żelisławice and section żelisławice – Koniecpol, including: 1) Local control from the signaling control performing with LCD computer with software 2) The inclusion of electric heating switchgears to the electric power devices monitoring system 3) Transmission between signaling boxes and swithboards with electric heating fiber 4) The use of the transmission protocol for local control PPM2 5) The use of the transmission protocol for remote control PIMNET P2 6) Implementation of the program to visualize the remote control on the intranet 7) Installation of cameras on lamp posts for monitoring the station in order to prevent thefts, using a single opitical fiber.
9 31/01/2014 Modernization of the railway line No.132 Route Błotnica Strzelecka – Opole Groszowice, track No.1 – section 69, 71, 73
10 30/01/2014 Modernization of the catenary network and electric heating of point switches devices at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting
11 28/02/2014 Modernization of the railway line No.132 Route Błotnica Strzelecka – Opole Groszowice, track No.1 – section 61, 61a, 63, 65, 73a, 61a, 75
12 28/04/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie, station: Pawonków Completing for catenary network equipment (pegs, hangers, anchoring); railway line no.61 and 700, section Częstochowa – Fossowskie, station Pawonków
13 28/04/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring) railway line Warsaw Łódż, station Radziwiłłów
14 28/04/2014 Modernization of the catenary network on the railway line E65, section: Warsaw – Gdynia, stage I, area: LCS Malbork Implementation of pegs for crossing 62m, 64, 65 and 5 pieces of hangers of the section L1 in the ramification Dąbrówka Malborska
15 28/04/2014 Modernization of the catenary network at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Completing for catenary network equipment (pegs, hangers, anchoring); route żelisławice – Koniecpol, track 2, 10 sections: L2z, L-2, L-4, L-6, L-8, L-10, L-12, L-14, L-16, L-18
16 28/04/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring) railway line Warsaw Łódż, route Warsaw Włochy – Pruszków, track 1, sections: L1, L3, L5, L7, L9, L11, L13, L15, L17, L81, L71
17 11/04/2014 Modernization of the railway line No.132 Completing for catenary network equipment (pegs, hangers, anchoring)
18 28/04/2014 Modernization of the catenary network on the railway line E65, section: Warsaw – Gdynia, stage I, area: LCS Malbork Completing for catenary network equipment (pegs, hangers, anchoring); station Mleczewo
19 04/2014 Modernization of the catenary network on the railway line E65, section: Warsaw – Gdynia, stage I, area: LCS Malbork Szymankowo – Pruszcz Gdański – reparation of staves; an order no.Ez15-ez2a-074-167a/2014
20 05/05/2014 Modernization of the catenary network on the railway line E65, section: Warsaw – Gdynia, stage I, area: LCS Malbork 6 hangers and 7 pegs of section L18 and 11 hangers and 181 pegs for section L7; railway line E65, station Szymankowo
21 15/05/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring) railway line Warsaw Łódż, route Pruszków – Grodzisk Mazowiecki, track 1, sections: L1p,1, 3, 5, 7, 9, 11, 13, 15, 17
22 10/06/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring) railway line Warsaw Łódż, route Warsaw Włochy – Pruszków, track 3, sections: L92, 91, 76, 74, 78, 61, 60
23 15/06/2014 Modernization of the catenary network at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Completing for catenary network equipment (pegs, hangers, anchoring); route Lisów – Kochanowice, track 1, sections: 1L, 1, 3
24 15/06/2014 Modernization of the catenary network at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Completing for catenary network equipment (pegs, hangers, anchoring); route Lubliniec – Kochanowice, track 1, sections: 1, 3, 5, 7, 9
25 15/06/2014 Modernization of the catenary network at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Completing for catenary network equipment (pegs, hangers, anchoring): station żelisławice, track 4, section 41; track 2, turnout sections 2 and 4; track1, turnout sections 1 and 3; track 3, sectionL31 – 6 sections in total
26 15/06/2014 Modernization of the catenary network at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Completing for catenary network equipment (pegs, hangers, anchoring); route Błachownia – Herby Stare, track 1, sections: 1, 3, 5, 7, 9
27 15/06/2014 Modernization of the catenary network at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Completing for catenary network equipment (pegs, hangers, anchoring); route Gnaszyn – Błachownia, tracks 1-4, sections: 299, 301, 295, 297
28 15/06/2014 Modernization of the catenary network at the station żelisławice and on the railway line 61, section: żelisławice – Koniecpol Completing for catenary network equipment (pegs, hangers, anchoring); station Liszów, track 1, section L1
29 13/06/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting, section: Pruszków – Grodzisk Mazowiecki
30 28/06/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting, section: Częstochowa – Fossowskie
31 06/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); station Grodzisk Mazowiecki, sections L1P, L11/12
32 10/06/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring)ł railway line Warsaw Łódż, route Warsaw Włochy – Pruszków, 12 sections: 31, 33, 35, 37, 39, 41, 43, 45, 47, 49, 73, 83
33 15/06/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring); route Pludry – Fossowskie, track 1, section 1F
34 15/06/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring); route Lisów – Liswarta, track 1, sections 5,7
35 15/06/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring); route Herby – Liswarta, track 1, sections 1,3
36 15/06/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring); station Herby, track 1, section L-13
37 15/06/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring); station Blachownia, track 1, sections no.11, 12
38 15/06/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); route Warsaw Włochy – Pruszków, track 1, sections 100(1), 100(2), 78
39 15/06/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Podłęże – Bochnia Completing for catenary network equipment (pegs, hangers, anchoring); station Kłaj, track 1, sections no. L21, L24, L4
40 15/06/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Podłęże – Bochnia Completing for catenary network equipment (pegs, hangers, anchoring); station Kłaj, track 4, section no. L20
41 15/06/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Podłęże – Bochnia Completing for catenary network equipment (pegs, hangers, anchoring); station Podłęże, track 1, sections no. L7, L17, L19, L25
42 15/06/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Podłęże – Bochnia Completing for catenary network equipment (pegs, hangers, anchoring); station Podłęże, track 2, sections no. L9, L13
43 15/06/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Podłęże – Bochnia Completing for catenary network equipment (pegs, hangers, anchoring); station Podłęże, track 4, sections no. L11, L15, L26
44 15/06/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); route Pruszków – Grodzisk Mazowiecki, section L19
45 16/06/2014 Unloading of supporting structures
46 15/07/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring); route Częstochowa Stradom – Częstochowa Gnaszyn track 1, Sections 279, 281, 283
47 16/07/2014 Modernization of the railway line No.132 Completing for catenary network equipment (pegs, hangers, anchoring), route Błotnica Strzelecka – Opole Groszowice, sections: L-3, L-81, L79, L-20, L-24, L-30, L30A, L-75, L-77
48 22/07/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); route Pruszków – Grodzisk Mazowiecki, track 3, sections: L21P, L21, L23, L25, L27, L29, L31, L33, L35, L37, L39, L20A, L31G
49 30/07/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring), route żyrardów – Radziwiłłów Mazowiecki, track 1, sections: L3, L5, L7, L9, L11, L13, L15, L17, L19
50 18/07/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); station Grodzisk Mazowiecki, sections no.L21, L22, L33, L34
51 18/07/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); station Grodzisk Mazowiecki, turnout crossings – 2-5, 2-9
52 01/08/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Unloading of pile poles at the station Kochanowice
53 01/08/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring); interrail courses’ connections on the railway line no.61 and 700, section Częstochowa – Fossowskie
54 06/08/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Bochnia – Biadoliny, station Brzesko Okocim Unloading of supporting structures
55 31/08/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting, route żyrardów – Radziwiłłów
56 21/08/2014 Revitalization of the railway line no.61 and 572 on the section Wloszczowa North – Częstochowa Stradom Execution of the telecommunication works for the station żelisławice and section żelisławice – Koniecpol, including: 1) Local control from the signaling control performing with LCD computer with software 2) Powering of switchgears from the transformer stations 3) The use of the transmission protocol for local control PPM2 4) Reconciliation of computer documentation for electric heating of point switches devices by the admistrator of Elecrical Power Devices Monitoring System, regarding inclusion in the system 5) Elaboration of post-executive documentation
57 01/09/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); route żyrardów – Radziwiłłów, track 1 section no.L1
58 01/09/2014 Modernization of the railway line E30, Cracow – Rzeszów, Bochnia – Biadoliny, station Brzesko Okocim Completing for catenary network equipment (pegs, hangers, anchoring); route Bochnia – Brzesko Okocim track 2, sections no.L2, L4, L6, L8, L10, L12, L14, L16, L18
59 30/09/2014 Modernization of the railway line E30, Cracow – Rzeszów, Section: Bochnia – Biadoliny, station Brzesko Okocim Completing for catenary network equipment (pegs, hangers, anchoring); station Brzesko Okocim Section L2
60 30/09/2014 Modernization of the railway line E30, Cracow – Rzeszów Completing for catenary network equipment (pegs, hangers, anchoring); station Wola Rzędzińska sections no.L5, L7, L10, L11, L14; station Podłęże L7, L9, L11
61 30/09/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring) station Grodzisk Mazowiecki turnout crossing L111, route Warsaw Włochy – Pruszków
62 30/09/2014 Revitalization of the railway line no.61 and 572 on the section Wloszczowa North – Częstochowa Stradom Completing for catenary network equipment (pegs, hangers, anchoring) Liswarta- Lisów sections no.L6 and L8; station Lisów section no.234; Lisów – Kochanowice sections no.L2L, L2, L4; Kochanowice – Lubliniec sections no.L2, L4, L6, L8, L10; Częstochowa Osobowa – Częstochowa Stradom sections no.L98, L135, L136
63 09/10/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring) for the station Częstochowa Osobowa section no.98 track 1, and Częstochowa Stradom section no.135 track 1, no.136 track 1
64 09/10/2014 Completing of 84 hangers for a station środa Wielkopolska section no. L-13, L-1, L-3, route środa Wielkopolska – Pierzchno, sections: L-1, L-3, L-5, L-7, L-9, L-11, station Pierzchno section L-1
65 12/10/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Podłęże – Bochnia Implementation of rail course and intertracks’ connections and turnouts’electric connections at the section Podłęże – Bochnia track 1, 2, 4.
66 12/10/2014 Modernization of the railway line E30, Cracow – Rzeszów, section: Podłęże – Bochnia Excavations and implementation of the railing cable at the section Podłęże – Bochnia, tracks 1, 2, 4, 3p
67 31/10/2014 Modernization of the railway line No.132 Completing for catenary network equipment (pegs, hangers, anchoring); route Błotnica Strzelecka – Strzelce Opolskie track 2, sections: L-004, L-008, L-010, L-0-16, L-018. Route Szymiszów – Kamień śląski track 2: L-044a, L-046, L-048, L-050, L-052, L-054.
68 16/10/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring); station Grodzisk Mazowiecki L-211, L-11, L-23, L-112, L-114, L-119
69 30/10/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Implementing of the rail courses’ connections on the railway line no.61 and 700, section: Częstochowa – Fossowskie – 162 rail courses’ connections
70 21/10/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring): route Pruszków – Grodzisk Mazowiecki
71 31/10/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting, station Grodzisk
72 17/10/2014 Modernization of the railway line No.132 Completing for catenary network equipment (pegs, hangers, anchoring); route Błotnica Strzelecka – Strzelce Opolskie track 2: L-012, L-014. Route Szymiszów – Kamień śląski track 2:L-044. Route Strzelce Opolskie – Szymiszów track 2: L-032, L-034, L-036, L-038, L-040. Route Strzelce Opolskie – Szymiszów track 1: L-041
73 26/10/2014 Modernization of the railway line No.132 Completing for catenary network equipment (pegs, hangers, anchoring); route Tarnów Opolski – Opole Groszowice track 2, sections: L-074, L-074a, L-076, L-06a, L-078, L-080, L-082, L-084, L-086, L-081
74 07/10/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw; modernization of the catenary network of the railway line no.61 and 700, section Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring). Line 61 route Częstochowa Stradom – Częstochowa Gnaszyn track 2, L278, L280, L282; station Częstochowa Gnaszyn track 1 and 2, turnouts L284, L285, L288, L291, L287, L289; route Warsaw Włochy – Pruszków track 2, L294, L296, L298, L300; station Blachownia track 7, L22, L211, L61, L101, L2G, L41, L112; route Lubliniec – Fossowskie (anchoring)
75 10/12/2014 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Implementation of rail courses’ connections at the railway line no.61 and 700, section Częstochowa – Fossowskie – 192 pieces
76 17/12/2014 Line 137 Tarciszów – Gliwice Łabędy Completing for catenary network equipment (pegs, hangers, anchoring), line 137 Tarciszów – Gliwice łabędy
77 08/12/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs)
78 01/12/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw; modernization of the catenary network of the railway line no.61 and 700, section Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring), 5 sections, station Grodzisk Mazowiecki, route Warsaw Włochy – Pruszków (Warsaw Włochy – Pruszków, Pruszków – Grodzisk Mazowiecki) station Lubliniec (route Blachownia – Herby), station Blachownia (route Blachownia – Herby)
79 12/12/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Implementation of rail course and intertracks’ connections at the railway line no.1, route Warsaw Włochy – Grodzisk
80 18/01/2015 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting, 88 groundings, Grodzisk
81 12/01/2015 Modernization of the railway line E30, Cracow – Rzeszów Completing for catenary network equipment (pegs, hangers, anchoring), 23 sections, E30 Dębica Grabiny
82 20/01/2015 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring), 12 sections, station Częstochowa Stradom
83 08/02/2014 Modernization of the railway line E30, Cracow – Rzeszów Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting 143 on E30
84 06/02/2014 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring), 6 sections, Grodzisk
85 24/03/2015 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring), 10 sections, Grodzisk – żyrardów
86 17/03/2015 Modernization of the railway line E30, Cracow – Rzeszów Completing for catenary network equipment (pegs, hangers, anchoring), 7 sections, E30 Brzesko Badoliny
87 24/03/2015 Modernization of the catenary network on the railway line no.61 and 700, section: Częstochowa – Fossowskie Completing for catenary network equipment (pegs, hangers, anchoring), route: Herby Stare – Liswarta, 3 sections
88 31/03/2015 Modernization of the railway line E30, Cracow – Rzeszów Assembling of the grounding of supporting structures by hammering groundings indicated in the project documentation with a measurement of grounding resistance, location painting 124 pieces, Okocim – Brzesko Biadoliny
89 30/04/2015 Service of cuting of dissasembled copper catenary wires and tow ropes
90 07/04/2015 Modernization of the railway line No.1 – section: Skierniewice – West Warsaw Completing for catenary network equipment (pegs, hangers, anchoring), 5 sections, station Grodzisk Mazowiecki